溪收费公路研究及扩阔工程

塔尔萨县,OK

Our team expedited a massive widening project design with minimal effects on traffic of the environment.

The Creek Turnpike Widening project featured design and plan production for widening nearly eight miles of roadway from four lanes to six by adding two lanes along the center median. The project called for limited traffic disruption despite the need to widen 20 bridges. 进一步, the timeline to design and let the project for construction was compressed from the original 15-month design effort to eight months to meet the needs of the client, 俄克拉荷马州收费公路管理局(OTA). Environmental concerns that limited construction on certain project segments to specified months of the year had to be factored into the project design and the suggested sequence of construction.

创新 and communication were instrumental in the successful plan.

设计活动, 与受影响的公共和私人机构进行协调, 以及与旅行社的沟通得以简化. Special attention was given to designing a solution that would minimize the impact of construction on traffic. The Benham team employed the innovative solution of strengthening existing pier caps with fiber wrap composite products, allowing most of the existing bridges to be used and preventing the need for temporary bridges or closing additional lanes. Four lanes of traffic (two lanes eastbound and two westbound) and all interchange access to and from the Creek Turnpike remained open throughout construction. Only minor disruption to cross-street traffic was required during the overhead placement of bridge beams, and widening occurred without any interruption to the toll-collection capability.

客户按时开通了一条大大改善的高速公路.

OTA was able to open this nearly eight-mile stretch of the Creek Turnpike on schedule. The mainline median widening transformed the existing 46-foot-wide median from an open, depressed grassed median into a paved median consisting of an additional traffic lane and inside shoulder in each direction. 除了增加容量, additional lanes and the installation of a concrete median barrier improved the safety of this Creek Turnpike segment. Aesthetically pleasing sound and screen walls built to benefit the residential areas along the widened turnpike have been viewed favorably by the public.

  • 美国工程公司协会(ACEC)荣誉奖
  • 设计和计划生产约41,400 linear feet of mainline widening of the existing four-lane roadway to six lanes by adding two lanes along the center median
  • 加宽10对现有的克里克收费公路大桥(20座桥梁)
  • Originally planned 15-month design effort was compressed to 8 months to meet the client’s needs
  • 调查
  • 岩土工程调查
  • 效用搬迁
  • 优先权文件
  • 照明
  • 排水及铺面
  • 信号作用
  • 公众参与
  • 交通一直畅通无阻

相关项目

Benham did exceptional work in the preparation of design plans and responding to construction related issues for the expansion project on the Creek Turnpike in 塔尔萨. On the day that the contract was awarded to Benham by the Oklahoma Turnpike Authority, 设计时间被压缩到8个月."

大卫·默多克,体育顾问
俄克拉荷马州收费公路管理局总工程师
克里克收费公路下的桥梁地下通道

Benham did exceptional work in the preparation of design plans and responding to construction related issues for the expansion project on the Creek Turnpike in 塔尔萨. On the day that the contract was awarded to Benham by the Oklahoma Turnpike Authority, 设计时间被压缩到8个月."

大卫·默多克,体育顾问
俄克拉荷马州收费公路管理局总工程师
克里克收费公路航拍照片